What the package covers
Mobilisation and site set-up
Access control, welfare facilities, and temporary security for the duration of the works, as the project requires.
Site hoarding and perimeter protection
Steel and timber hoarding with jersey barriers, pedestrian walkway enclosures and access gates, installed in phases to match the road frontages.
Demolition and strip-out
Buildings, boundary walls, kerbs and gate structures taken down under an approved method statement.
Utility survey and below-ground removal
A utility survey (ground-penetrating radar where required) before any excavation, authority approvals, and hand digging near identified services.
Site clearance and grading
Debris removal, grading and a topographic survey of the cleared plot.
Traffic management
Temporary traffic arrangements agreed with the authorities where the works affect the road.
Waste segregation and reporting
Waste sorted by stream, with a waste log and diversion reporting for the engineer where the contract requires it.
Handover
Backfill compaction records, survey and documentation, so the next contractor starts from a known, clean baseline.
What determines the cost of site preparation
- The plot area and how many road frontages it has.
- The existing structures and the quantity of debris to remove.
- Underground services found by the utility survey, and any below-ground removal.
- Whether the hoarding is installed in phases.
- Waste handling and the haul to approved disposal facilities.
- The programme and the handover date.
How long does site preparation take?
The duration depends on the plot area, the existing structures, the utilities and the approvals. After a site visit and a review of the drawings we agree a programme with you.
What to send for a quote
- The location and a plot plan.
- The existing structures, and any survey or drawings.
- Whether hoarding, demolition and clearance are all in scope.
- Access constraints and the programme.
Our site preparation checklist for contractors and developers covers the sequence in more detail.
How an enabling package runs
Survey and scope confirmation
Site visit, review of drawings and existing structures, and agreement of the scope, programme and interfaces.
Approvals and utilities
Method statement and risk assessment approval, a utility survey, and authority approvals before excavation.
Hoarding and mobilisation
Perimeter hoarding installed, in phases where the site has several road frontages, with access control, security and traffic arrangements.
Demolition and clearance
Strip-out, controlled demolition, below-ground removal and debris clearance inside the protected perimeter.
Grading, survey and handover
Grading, backfill compaction records, a topographic survey and a documented handover of a construction-ready site.
Safety and environment
One safety system covers every scope in the package.
- Safety management certified to ISO 45001, with a full-time HSE officer on site.
- A permit-to-work system for high-risk activities such as work at height, hot works and excavation.
- Risk assessments and method statements for every significant activity, communicated to all affected personnel.
- Environmental controls for dust, waste and hazardous materials run as part of the same package.
Built for project teams
- Main contractors and infrastructure contractors
- Developers and project owners
- Consultants and project management teams
- Government and semi-government entities
Demolition on its own
Need only the demolition scope? Read how a demolition job runs, from survey to handover.
Demolition contractor in RiyadhRelated guide
Riyadh Site Scope & Compliance Estimator
Select your scope to view mandatory municipal standards, required equipment, and get a tailored quote in minutes.
Enabling works, answered
What is site preparation (enabling works)?
Site preparation, or enabling works, is the preparatory work that must be complete before main construction starts, such as securing the site, removing existing structures, clearing and grading the plot, and protecting underground services.
Can one contractor deliver the whole site preparation in Riyadh?
Yes. Bariq Arabia delivers enabling works in Riyadh under one contract: demolition and removal of existing structures, site hoarding and gates, precast concrete barriers, clearance and levelling, so the main contractor receives a site that is secured and ready to start.
What is the difference between enabling works and demolition?
Demolition is one part of enabling works. An enabling package also covers hoarding, utility survey, clearance, grading, traffic management and handover, so the site is ready to build on, not just empty.
Do you handle utility diversions?
We identify underground services with a utility survey (ground-penetrating radar where required), apply for authority approvals with the results, and hand-dig near identified utilities. Diversion of networks beyond the plot boundary is outside our usual scope.
Can hoarding and demolition be awarded separately?
Yes. Each can be awarded on its own, and both are also available in one package.
Where do you work?
We are based in Riyadh and work on projects across the Kingdom. Send the location and programme and we will confirm mobilisation.
Which documents can you provide for prequalification?
Method statements and risk assessments, HSE, quality and environmental policies, ISO certificates, project references and equipment records are available in our prequalification package on request.
What comes first on an enabling works package?
Survey and approvals first, then the perimeter hoarding, then demolition and clearance inside it, and finally grading and a documented handover. Our site preparation checklist sets out the sequence.